Agie AGIECUT Challenge 2 – 2001 Model

Learn Price

Category:

Description

X Axis 350 mm
Y Axis 250 mm
Z Axis 256 mm
Automatic Wire Feeding Yes
Length x width x height 250.0 × 250.0 × 230.0
Weight 3600 kg
Worked hours 23062 hours
Hours under power 92029 hours
State good

AGIECUT Challenge 2 wire EDM machine

Travel: X / Y / Z = 350 x 250 x 256 mm
Conical cutting device: U = 70mm / V = ​​70mm
Automatic wire threading
R module for surface quality Ra 0.2 μm
Lowerable container
Wire diameter 0.1 – 0.33 mm
Handbox with LCD display AGIEJOGGER
Universal mounting frame

Satılık ikinciel CNC EDM Tel Erezyon makinesi Agie AGIECUT Challenge 2 – 2001 Model

Shipping Policy

Price Guide Valuation is 49 GBP ( British pound )
 Pay by Credit Card
           or
Pay by Wire Transfer


1.) CNCBUL.com does not own any of the equipment listed for sale on this site!..
2.) All information, offers and prices on this site are subject to change by the Machine owner and are non-binding!
3.) We are not a stocking dealer of New & Used Metalworking Machinery.
We are an online technology company about used CNC Machine Tools & Machinery sector.
Our Machine Dealer Partner companies are a stocking dealer of New & Used Metalworking Machinery. 
The stocks of our partner machine dealers are always changing!
 The stock status of the machines varies instantaneously!
4.) Machine Price information learning fee is limited to only 1 machine . It does not cover all machines in the system!..
5.) Our aim is to inform you about the market value of the machine you are looking for.
If the machine for which you requested the price has been sold, offers of machines with the same features or equivalent are sent to you by our International Machine Dealer partner companies as a separate offer.
6.) After the payment is received, the machine price information is sent via  email or Whatsapp as PDF format.
7.) Machine price information transmission time is between 15 minutes and 6 hours. This period varies according to the demand for proposals, working hours, days and hours.
8.) You can enter your company’s billing information in the ‘Note to Seller’ section when making the payment.